{"id":26315,"date":"2023-03-16T16:44:45","date_gmt":"2023-03-16T14:44:45","guid":{"rendered":"http:\/\/engind.es\/?page_id=26315"},"modified":"2026-11-18T10:23:39","modified_gmt":"2026-11-18T08:23:39","slug":"installation-projects","status":"publish","type":"page","link":"https:\/\/engind.articagency.net\/en\/servicios-de-ingenieria-industrial\/diseno-instalaciones-mep\/proyectos-de-instalaciones\/","title":{"rendered":"Facilities Projects (MEP in BIM)"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Types of installations<\/h2>\n\n\n\n<h2 class=\"wp-block-heading\"><b>what we take care of<\/b><\/h2>\n\n\n\n<div class=\"wp-block-group engind-includes is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group engind-item is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Projects and technical design reports for:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>New installation<\/li>\n\n\n\n<li>Installation Expansion<\/li>\n\n\n\n<li>installation reform<\/li>\n\n\n<\/ul>\n\n\n<\/div>\n\n\n\n<div class=\"wp-block-group engind-item is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Legalization of an existing installation<\/h3>\n\n\n<\/div>\n\n\n\n<div class=\"wp-block-group engind-item is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Initial Inspections<\/h3>\n\n\n<\/div>\n\n\n\n<div class=\"wp-block-group engind-item is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">periodic checks<\/h3>\n\n\n<\/div>\n\n\n\n<div class=\"wp-block-group engind-item is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Significant Modification (PCI)<\/h3>\n\n\n<\/div>\n\n\n\n<div class=\"wp-block-group engind-item is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">Exceptional procedure (PCI)<\/h3>\n\n\n<\/div>\n\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">facilities projects<b>\u00a0MEP (Mechanical, Electrical and Plumbing) in BIM (Building Information Modeling)<\/b>\u00a0they represent a revolutionary approach in the design and management of building systems. At Engind, we are proud to offer specialized services in the\u00a0<b>implementation and execution<\/b>\u00a0of projects\u00a0<b>MEP in BIM<\/b>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let us explain more about MEP installation projects in BIM and how we can help you.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The<b>\u00a0MEP systems\u00a0<\/b>they cover a wide range of essential components for the efficient operation of a building, such as HVAC, electrical, plumbing, lighting and more. Traditionally, the design and coordination of these systems have been challenging due to the complexity and the need for collaboration between different disciplines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, with the\u00a0<b>BIM adoption<\/b>, MEP facility projects have undergone a significant transformation. BIM enables the creation of detailed three-dimensional models that integrate accurate information about MEP systems into the context of the entire building. This makes it easier to plan, design, coordinate and manage these facilities more efficiently and accurately.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The adoption of MEP facility projects in BIM has allowed us to obtain numerous benefits, such as greater<b>\u00a0design precision<\/b>, better coordination between disciplines, a\u00a0<b>reduction of errors and costs<\/b>, an optimization of resources and a greater operational efficiency of the MEP systems.<\/p>\n\n\n\n<div class=\"wp-block-group engind-faq is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>BT and MT\/AT electrical installations<\/summary>\n\n<p class=\"wp-block-paragraph\"><strong>Type of Inspections:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Logistics warehouses (5)<\/li>\n\n\n\n<li>Locals of public concurrence (5)<\/li>\n\n\n\n<li>Industrial facilities with installed power &gt; 100 kW (10)<\/li>\n\n\n\n<li>Vehicle charging stations (5)<\/li>\n\n\n\n<li>Photovoltaic installations (5)<\/li>\n\n\n\n<li>High voltage electrical installations for private companies (5)<\/li>\n\n\n<\/ul>\n\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>refrigeration installations<\/summary>\n\n<p class=\"wp-block-paragraph\"><strong>Type of Inspections:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Installations with fluorinated refrigerant charge \u2265 5,000 T (1)<\/li>\n\n\n\n<li>Facilities with fluorinated refrigerant charge between 5,000 and 500 T (2)<\/li>\n\n\n\n<li>Installations with fluorinated refrigerant charge between 500 and 50 T (3)<\/li>\n\n\n\n<li>Control of leaks in devices of \u2265 5 T (1)<\/li>\n\n\n\n<li>Leakage control in devices of \u2265 50 T (6 M)<\/li>\n\n\n\n<li>Leakage control in devices of \u2265 500 T (3 M)<\/li>\n\n\n<\/ul>\n\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>thermal installations<\/summary>\n\n<p class=\"wp-block-paragraph\"><strong>Type of Inspections:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Systems with generators of P \u2265 70 kW (4)<\/li>\n\n\n\n<li>Facilities 15 years old (or more) and P \u2265 70 kW (10)<\/li>\n\n\n\n<li>Systems with generators of 20 kW \u2264 P \u2264 70 kW (5)<\/li>\n\n\n\n<li>Systems with generators (Gas) of P \u2264 70 kW (4)<\/li>\n\n\n\n<li>Systems with generators (Other fuels) of P \u2264 70 kW (2)<\/li>\n\n\n<\/ul>\n\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Fire protection facilities<\/summary>\n\n<p class=\"wp-block-paragraph\"><strong>Type of Inspections:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Risc Baix industrial establishments (5)<\/li>\n\n\n\n<li>Industrial facilities of Risc Mig (3)<\/li>\n\n\n\n<li>High Risk industrial establishments (2)<\/li>\n\n\n\n<li>The rest of the facilities correspond to the RSCIEI (10)<\/li>\n\n\n\n<li>Existing facilities at the entry into force of the RIPCI (10)<\/li>\n\n\n<\/ul>\n\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>pressure equipment<\/summary>\n\n<p class=\"wp-block-paragraph\"><strong>Type of Inspections:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Containers for gases, liquids and cryogenic Cat. I-2 and II-2 (8)<\/li>\n\n\n\n<li>Containers for gases, liquids and cryogenic Cat. I-1, II-1, III-2 and IV-2 (level B) (6)<\/li>\n\n\n\n<li>Containers for gases, liquids and cryogenic Cat. I-1, II-1, III-2 and IV-2 (level C) (12)<\/li>\n\n\n\n<li>Boilers and equipment subjected to flame, Cat. I-II-III and IV (level B) (3)<\/li>\n\n\n\n<li>Boilers and equipment subjected to flame, Cat. I-II-III and IV (level C) (6)<\/li>\n\n\n<\/ul>\n\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>chemical storage<\/summary>\n\n<p class=\"wp-block-paragraph\"><strong>Type of Inspections:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Overall (5)<\/li>\n\n\n\n<li>ITC APQ 1. Flammable liquids (5)<\/li>\n\n\n\n<li>ITC APQ 2, 3, 4, 5 and 8 (5)<\/li>\n\n\n\n<li>ITC APQ 6, 7, 9 and 10 (5)<\/li>\n\n\n<\/ul>\n\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>fuel gases<\/summary>\n\n<p class=\"wp-block-paragraph\"><strong>Type of Inspections:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li>Container storage and distribution centers (2)<\/li>\n\n\n\n<li>LPG storage facilities in fixed tanks (15)<\/li>\n\n\n\n<li>High Risk industrial establishments (2)<\/li>\n\n\n\n<li>LPG container facilities for own use (5)<\/li>\n\n\n\n<li>Satellite LNG plants (15)<\/li>\n\n\n<\/ul>\n\n\n<\/details>\n\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><em>* Between brackets is the periodicity of each inspection in years or months (M)<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"177\" src=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-equipos-de-presion-300x177.png\" alt=\"installation projects pressure equipment\" class=\"wp-image-26319\" title=\"\" srcset=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-equipos-de-presion-300x177.png 300w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-equipos-de-presion-18x12.png 18w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-equipos-de-presion-480x284.png 480w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-equipos-de-presion.png 724w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"214\" src=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-productos-quimicos-almacenamiento-300x214.png\" alt=\"facility projects chemicals storage\" class=\"wp-image-26320\" title=\"\" srcset=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-productos-quimicos-almacenamiento-300x214.png 300w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-productos-quimicos-almacenamiento-18x12.png 18w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-productos-quimicos-almacenamiento-400x284.png 400w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-productos-quimicos-almacenamiento-480x343.png 480w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-productos-quimicos-almacenamiento.png 706w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-electricos-300x200.png\" alt=\"electrical installation projects\" class=\"wp-image-26326\" title=\"\" srcset=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-electricos-300x200.png 300w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-electricos-18x12.png 18w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-electricos-480x320.png 480w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-electricos.png 718w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"201\" src=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-frigorificas-300x201.png\" alt=\"refrigeration installation projects\" class=\"wp-image-26325\" title=\"\" srcset=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-frigorificas-300x201.png 300w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-frigorificas-18x12.png 18w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-frigorificas-480x321.png 480w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-frigorificas.png 648w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"193\" src=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-gases-combustibles-300x193.png\" alt=\"fuel gas facility projects\" class=\"wp-image-26321\" title=\"\" srcset=\"https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-gases-combustibles-300x193.png 300w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-gases-combustibles-18x12.png 18w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-gases-combustibles-480x309.png 480w, https:\/\/engind.articagency.net\/wp-content\/uploads\/2023\/03\/proyectos-de-instalaciones-gases-combustibles.png 702w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><span>Optimize your installation projects with Engind. Discover how our experience in MEP BIM can boost the efficiency and quality of your constructions.<\/strong><\/span><\/h3>","protected":false},"excerpt":{"rendered":"<p>Tipos de instalaciones De que nos encargamos Proyectos y memorias t\u00e9cnicos de dise\u00f1o para: Legalizaci\u00f3n de una instalaci\u00f3n existente Inspecciones Iniciales Controles peri\u00f3dicos Modificaci\u00f3n significativa (PCI) Tr\u00e1mite de excepcionalidad (PCI) Los proyectos de instalaciones\u00a0MEP (Mec\u00e1nicas, El\u00e9ctricas y de Fontaner\u00eda) en BIM (Building Information Modeling)\u00a0representan un enfoque revolucionario en el dise\u00f1o y la gesti\u00f3n de sistemas [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30507,"parent":28110,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"pgc_sgb_lightbox_settings":"","footnotes":""},"class_list":["post-26315","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/pages\/26315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/comments?post=26315"}],"version-history":[{"count":6,"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/pages\/26315\/revisions"}],"predecessor-version":[{"id":31604,"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/pages\/26315\/revisions\/31604"}],"up":[{"embeddable":true,"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/pages\/28110"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/media\/30507"}],"wp:attachment":[{"href":"https:\/\/engind.articagency.net\/en\/wp-json\/wp\/v2\/media?parent=26315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}